Monday, October 6, 2008

Project update. Sorry its been so long.

Alot has happened with the cabin project since the last update. The roof was completed and then the windows went in. We were able to get these windows at an incredible price off of criagslist. And they matched quite nicely.

Here is another view of the building from the back with the windows in and the roof completed. Also in the middle of this wall the load center and meter are now installed.

Side view with the porch. We are going to add a banister around the porch for the kids and other not so careful people. Like yours truely. I stepped backward off the porch thinkng the steps were behind me. It was not to bad, just wigged out my leg. Could have been worse since it was like a 5 foot drop. Oh well. I guess i pioneered that for everyone.

Big happening, Bill Breeze came from Cali for two weeks and helped the team make huge progress. While he was here the power went in, and the dry wall and the bathrooms. Thanks a million Bill for your help.


Here is what the bathrooms look like. Very professional.

John put in the ceiling paneling with the exhaust fans. it all came out looking sweet. There are 3 lofts the biggest one being about 15 by 20 feet spilt level. And the drywall went in as well.


Dale wiring up the whole house. He even took the time to counter sink spot lights into some of the loft supporting logs. definately a nice touch.


Another view of one of the smaller lofts. They will be handy for living or working spaces, or just for lots of storage. which is kind of strange idea, as we never have any storage.

Stay tuned for more frequent updates.